Today, the growth of energy needs and the demand for sustainable energy solutions have made solar power plants an important energy source.

image loader

Today, the growth of energy needs and the demand for sustainable energy solutions have made solar power plants an important energy source. Tower type solar power plants (SPPs) provide high energy efficiency by providing an effective solution especially in land use. The construction and manufacturing stages of these systems are an important process to ensure the successful construction of tower type solar power plants.

1. Planning and Design Phase: The construction process of tower type solar power plant starts with the planning and design phase. At this stage, the project is planned by taking into account factors such as solar energy potential analysis, land topography and climate conditions. Engineers determine details such as positioning of solar panels, energy storage systems and infrastructure needs.

2. Foundation Construction: The first stage is the foundation construction of the tower type SPP. The foundation is a critical structure for fixing and supporting solar panels. Reinforced concrete foundation systems are generally preferred, and this stage includes construction teams digging the foundation, installing formwork, placing iron reinforcement and pouring concrete.

3. Tower Construction: Since SPP is a tower type, tower construction is another critical stage. Towers, usually made of steel, increase efficiency by keeping solar panels at a high point. This phase includes the fabrication and assembly of tower elements and the integration of power transmission lines.

4. Installation of Panels: After the foundation and tower structures are completed, solar panels are mounted. The panels can be located on tower-mounted tracking systems, allowing the panels to track the sun throughout the day. This increases energy efficiency.

5. Electricity and Transmission Lines: Electricity and transmission lines are established to distribute the energy production of the solar power plant and integrate it into the grid. This phase involves construction crews installing transformers, inverters, and power transmission lines.

6. Trial and Commissioning: After all components are assembled, the system is tested and put into operation. This phase involves ensuring the efficiency, safety and environmental compatibility of energy production.